COCOMO model provides an accurate size of the project parameters. It is good for a quick estimate of the cost. The estimated effort and scheduled time are given by the relationship as follows.

What are the types of Cocomo model?

These are types of COCOMO model:

  • Basic COCOMO Model.
  • Intermediate COCOMO Model.
  • Detailed COCOMO Model.

What is Cocomo model Mcq?

Constructive Cost Estimation Model.

What is Cocomo model Quora?

It is the cost estimation model for the software Projects. You can estimate how much project will take time to complete.

What are the limitations of Cocomo model?

The disadvantages of COCOMO include: ® It ignores requirements volatility (but an organization may add this as an extra adjustment factor in computing EAF). ® It ignores documentation and other requirements. ® It ignores customer attributes—skill, cooperation, knowledge, and responsiveness.

What is the full form of COCOMO Mcq?

Explanation: Barry Boehm introduced a hierarchy of software estimation models bearing the name COCOMO, for COnstructive COst MOdel.

What is the full form of Cocomo Mcq?

How Cocomo model can help in project development and project completion?

The COCOMO (Constructive Cost Model) is one of the most popularly used software cost estimation models i.e. it estimates or predicts the effort required for the project, total project cost and scheduled time for the project. This model depends on the number of lines of code for software product development.

What is Cocomo model used?

Cocomo (Constructive Cost Model) is a regression model based on LOC, i.e number of Lines of Code. It is a procedural cost estimate model for software projects and is often used as a process of reliably predicting the various parameters associated with making a project such as size, effort, cost, time, and quality.

What is the basic use of Cocomo model describe its different alternates?

Who proposed Cocomo model?

Barry W. Boehm
The Constructive Cost Model (COCOMO) is a procedural software cost estimation model developed by Barry W. Boehm.

How do you estimate a project using Cocomo model?

In COCOMO, the general calculation steps of COCOMO-based cost estimation are the following:

  1. Get an initial estimate of the development effort from evaluation of thousands of delivered lines of source code (KDLOC).
  2. Determine a set of 15 cost factors from various attributes of the project.

What is the standard extension for installation files on Windows computers?

.exe format
The installation file will be saved to your computer in .exe format. Pronounced dot e-x-e, this is the standard extension for installation files on Windows computers.

What is the COCOMO model?

It was proposed by Barry Boehm in 1970 and is based on the study of 63 projects, which make it one of the best-documented models. The key parameters which define the quality of any software products, which are also an outcome of the Cocomo are primarily Effort & Schedule: Effort: Amount of labor that will be required to complete a task.

What is the Basic COCOMO equation with example?

Solution: The basic COCOMO equation takes the form: Example2: A project size of 200 KLOC is to be developed. Software development team has average experience on similar type of projects. The project schedule is not very tight. Calculate the Effort, development time, average staff size, and productivity of the project.

How many types of COCOMO are there?

Depending upon the complexity of the project the COCOMO has three types. Such as: 1. The Basic COCOMO It is the one type of static model to estimates software development effort quickly and roughly.

What are the six phases of Detailed COCOMO?

The Six phases of detailed COCOMO are: 1 Planning and requirements 2 System structure 3 Complete structure 4 Module code and test 5 Integration and test 6 Cost Constructive model More