How long does Sikkens stain take to dry?
How long does Sikkens stain take to dry?
Drying Time – 24 hours minimum at 68°F and 65% relative humidity. At temperatures below 50º F (10º C) or conditions of high humidity the drying time will be extended. Proluxe Cetol SRD dries to touch in approximately 6 hours. Wait 24 – 48 hours for light foot traffic.
How long does Sikkens stain last?
Sikkens states in their literature that you should expect to get 2-4 years life out of their system on a sunny side of a house, and 3-5 years on a shady side.
How long does Sikkens HLS take to dry?
Features and Highlights
Brand | Sikkens |
---|---|
No. of coats | 1-3 |
Coverage | Up to 12m² per litre |
Drying time | 24 hrs |
Size | 1L, 2.5L, 5L |
How long does Sikkens SRD need to dry before rain?
Drying Time: Touch-dry six (6) – eight (8) hours; dry to walk on after 24 hours minimum at 68º F and 65% relative humidity. Note: During application, moisture content of wood substrate should not exceed 21%. Do not apply when rain, dew, or frost are forecast within five (5) hours of application.
Does stain get darker as it dries?
Apply a second coat of stain after the first has dried fully. This will usually produce a darker coloring, but it adds a step to the process and slows production.
How long does cetol 1 take to dry?
Since outdoor furniture and fences are considered to be in a high moisture environment, it is recommended to apply three (3) coats of Cetol 1, allowing a minimum of 24 hours dry time between coats. A maintenance coat of Cetol 1 is recommended every one (1) – two (2) years.
How long does cetol HLS take to dry?
Decks (walk-on surface), outdoor furniture, doors & louvres: Apply three coats of Cetol HLSe. Allow a minimum drying time of 24 hours between coats.
Should I apply 2 coats of stain?
How Many Coats of Stain Should I Apply? Olympic solid color wood stains require the application of two thin coats for optimum durability. Applying two coats of solid wood stains will also hide wood grain and imperfections.